In the last week, we have accomplished:
1. completing all major plumbing (there's still a few small things to do for the sinks)
2. put in new insulation on the outside wall, including spray foam around the windows
3. put down cement where vanity was and around the entire edge of the bathroom to level the floor
4. cut the majority of the floor tiles
5. installed four (lol) floor tiles!
No comments:
Post a Comment